Vidor, TX GulfLIne ProjectVidor, TX GulfLIne Project

Roadway: I-10

County: Orange

Texas Department of Transportation- Beaumont District

Length: Approximately 12 Centerline Miles

Project Completion: Summer 2010

This project consisted of applying GulfLine Inverted Contrast markings on the yellow inside edge line, white lane lines, and the white outside edgeline.


Districtwide Two Lane RoadwaysDistrictwide Two Lane Roadways

Roadway: Districtwide Two Lane Roadways

Texas Department of Transporation-Paris District

Length: Approximately 100 Centerline Miles

Project Completion: Fall 2010

This project consisted of applying GulfLine Yellow Inverted Profile markings as centerline rumble stripes. This project was funded by the Federal Highway Administration"s Highway Safety Improvement Program (HSIP).


Cass County, TXCass County, TX

Roadway: US 59

Length: Approximately 35,000 LF

Product: GulfLine Inverted Profile Contrast (Black- 12 inches by 16 feet length; White- 6 inches by 10 feet length)

Owner: Texas Department of Transportation- Atlanta District


Little Rock, ARLittle Rock, AR

Roadway: US167/US67

Length: Approximately 19,260' of white edge line, 10,526' of yellow edge line, and 9,990' of contrast

Product: GulfLine

Owner: Arkansas Department of Transportation

The project is located in AHTD District 6 and the striping was done by Contractors Specialty out of Maumelle, AR. The striping was completed in May of 2011.


Sumner County, TNSumner County, TN

Roadway: Hwy 386

Length: Approximately 13.1 miles

Product: GulfLine Inverted Profile

Owner: Tennessee Department of Transportation

This GulfLine project consisted of 13.1 miles of Inverted Profile on Hwy 386.